AeroDue

Closed month

AeroDue Radar data story: September 2026

2 verified notices starting in September 2026; BOD named most often (1); median detection lead -27.4 days.

Verified notices2
Later cancelled, withdrawn or suspended0
Airports named2
Median detection lead-27.4 d

Read this first. These are notices from the official sources AeroDue monitors in its listed markets. A country with more monitored sources produces more notices; differences between countries describe monitoring coverage, not relative disruption risk. A notice does not establish that a particular flight was delayed or cancelled.

Airports named in verified notices

Airports by number of verified notices that name them
Airport (IATA)NoticesCountry
BOD1France
DUS1Germany

0 of 2 notices name no specific airport (for example national strikes or rail access).

How far ahead were they detected?

Detection lead = published start minus the time AeroDue first detected the official notice. Median -27.4 days, mean -27.4 days (2 notices measured).

Detection lead time
Lead timeNoticesShare
Detected after the start2100%
Less than 1 day00%
1 to 3 days00%
3 to 7 days00%
7 to 14 days00%
More than 14 days00%

Categories and transport

Notices by category
CategoryNotices
Operational period, works or restriction2
Notices by transport mode (a notice can cover more than one)
ModeNotices
Air1
Airport access1
Rail1

Monitored universe

Notices by country, with the monitoring behind them
CountryNoticesMonitored sourcesCoverage score
Germany1644/100
France1531/100

The coverage score is AeroDue's configured-capability measure (100 * (healthy configured categories + categories with >=2 independent healthy organizations) / (2 * 8). Empty parser results are not proof of absence. This is configured capability coverage, not national event recall.). It is not national event recall.

All notices in September 2026

Verified notices
StartNoticeStatus
4 Sept 2026Düsseldorf Airport: rail access restrictions during Duisburg/Essen engineering worksresolved
30 Sept 2026Bordeaux Airport: taxiway works near runway 05/23, with possible runway use changesresolved

Download and cite

CSV · JSON · Methodology

Cite as: AeroDue Radar, “September 2026 data story”, https://www.aerodue.com/en-gb/upcoming-disruptions/data-story/2026-09/, generated 2026-11-19T20:55:57.105Z. Each notice links to its official source on the event page.