BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//AeroDue//Upcoming Disruptions//EN
CALSCALE:GREGORIAN
BEGIN:VEVENT
UID:gb-national-rail-works-corkickle-9-dec-20251209@aerodue.com
DTSTAMP:20261028T013038Z
DTSTART;VALUE=DATE:20251209
DTEND;VALUE=DATE:20270516
SUMMARY:Bransty Tunnel track renewal: buses replace trains between Corkic
 kle and Whitehaven until further notice
URL:https://www.nationalrail.co.uk/engineering-works/corkickle-9-dec-2025
 1209/
DESCRIPTION:Date marker only\; not an all-day disruption claim.  Starts T
 uesday 09 December 2025 to Saturday 15 May 2027 If you would like to fol
 low this incident on X\, please use Train operators affected Northern Ro
 ute(s) affected Between Lancaster / Barrow-in-Furness and Carlisle Descr
 iption During pre-planned engineering work in Bransty Tunnel\, between C
 orkickle and Whitehaven\, inspections revealed unstable ground condition
 s which require urgent repair. As a result\, the line through the tunnel
  is closed. Customer advice: Service impact Train services are running b
 etween Lancaster / Barrow-in-Furness and Corkickle\, and also between Wh
 itehaven and Carlisle. Buses will replace trains between Corkickle and W
 hitehaven. Please speak to station staff\, see online journey planners o
 r consult customer information screens for departure times of these buse
 s. Journey times may be extended by up to 60 minutes whilst travelling b
 y road transport. Ticket acceptance If the train you have a ticket for i
 s cancelled\, you can travel on any Northern or TransPennine Express ser
 vice within two hours before or after your cancelled service was due to 
 depart. This is at no extra cost\, and does not require you to amend you
 r ticket. Additional information: At the end of July 2025\, Network Rail
  carried out assessments and surveys inside Bransty Tunnel ahead of plan
 ned full track and drainage renewal that was scheduled to take place dur
 ing August and September . This involved doing surveys to assess any wei
 ght limits for the heavy machinery needed for the planned renewals. Thes
 e surveys uncovered some areas under the railway which need strengthenin
 g before any work can progress. After assessing the initial survey data 
 by specialist expert engineers\, Network Rail has closed Bransty Tunnel 
 to all trains until further notice. The exact time frame for how long th
 ese repairs and subsequent track improvements will take is still being w
 orked on.  Last verified: 2026-10-28T01:30:38.466Z
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-national-rail-works-merseyrail-northern-line-20261011@aerodue.com
DTSTAMP:20261028T013038Z
DTSTART;VALUE=DATE:20261011
DTEND;VALUE=DATE:20261107
SUMMARY:Merseyrail Northern line tunnel upgrade: Buses replace trains bet
 ween Hunts Cross and Moorfields / Sandhills from Sunday 11 October to Fr
 iday 6 November
URL:https://www.nationalrail.co.uk/engineering-works/merseyrail-northern-
 line-20261011/
DESCRIPTION:Date marker only\; not an all-day disruption claim.  Starts S
 unday 11 October 2026 to Friday 06 November 2026 If you would like to fo
 llow this incident on X\, please use Train operators affected Merseyrail
  Route(s) affected Between Hunts Cross and Liverpool Central / Sandhills
  / Ormskirk\, between Liverpool Central and Sandhills / Southport / Orms
 kirk\, and also between Sandhills and Headbolt Lane Description Engineer
 ing work is taking place between Hunts Cross and Liverpool Central / San
 dhills\, closing various lines. Background information on the work can b
 e found below. Sunday 11 and 18 October: All Northern line trains will t
 erminate at Sandhills. No trains will run to Hunts Cross. All Wirral lin
 e trains will run only as far as James Street. Buses will run between Hu
 nts Cross and Sandhills. Sunday 25 October: All Northern line trains wil
 l terminate at Sandhills. No trains will run to Hunts Cross. North Wirra
 l trains will run only as far as Birkenhead North\, and South Wirral tra
 ins will run only as far as Rock Ferry. Buses will run between Hunts Cro
 ss and Sandhills\, Birkenhead North and Hamilton Square\, and between Ro
 ck Ferry and Hamilton Square. Sunday 1 November: All Northern line train
 s will terminate at Sandhills. No trains will run to Hunts Cross. North 
 Wirral trains will run only as far as Birkenhead North\, and South Wirra
 l trains will run only as far as Rock Ferry. Chester station is blocked 
 until 08:05\, the first train will be replaced by a bus to Moorfields. B
 uses will run between Hunts Cross and Sandhills\, Birkenhead North and H
 amilton Square\, and between Rock Ferry and Hamilton Square. Monday to S
 aturday: Buses will replace trains between Hunts Cross and Moorfields (n
 ot calling at Liverpool Central). An amended train timetable will run be
 tween Liverpool Central / Sandhills and Southport / Ormskirk / Headbolt 
 Lane. Background information: Network Rail are investing £3.5m to water
 proof and strengthen four tunnels which bring Merseyrail Northern line t
 rains into Liverpool city centre from the south. This will improve journ
 ey reliability for passengers by preventing water from entering the unde
 rground network\, which can cause problems with the third rail electrici
 ty supply to trains. To make the most of the same railway closure\, work
  will be continuing on the ongoing modernisation of power control system
 s – to make it quicker and easier to turn on and off the electrified r
 ail in future when scheduled ma Last verified: 2026-10-28T01:30:38.466Z
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-national-rail-works-limehouse-17-oct-20261017@aerodue.com
DTSTAMP:20261028T013038Z
DTSTART;VALUE=DATE:20261017
DTEND;VALUE=DATE:20261102
SUMMARY:No London-bound trains at Limehouse from 20:45 on Saturday 17 Oct
 ober to Sunday 1 November
URL:https://www.nationalrail.co.uk/engineering-works/limehouse-17-oct-202
 61017/
DESCRIPTION:Date marker only\; not an all-day disruption claim.  Starts S
 aturday 17 October 2026 to Sunday 01 November 2026 If you would like to 
 follow this incident on X\, please use Train operators affected c2c Rout
 e(s) affected Between Shoeburyness and London Fenchurch Street Descripti
 on Engineering work is taking place at Limehouse\, closing some lines. L
 imehouse platform 1 will be closed as work is carried out on the platfor
 m. As a result\, trains towards London will not call at Limehouse. Essex
  passengers for Limehouse\, should travel to London Fenchurch Street and
  catch the next available service back to Limehouse.  Last verified: 202
 6-10-28T01:30:38.466Z
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-national-rail-works-cardiff-queen-street-and-cathays-caerphilly-20
 261024@aerodue.com
DTSTAMP:20261028T013038Z
DTSTART;VALUE=DATE:20261024
DTEND;VALUE=DATE:20261031
SUMMARY:Amended trains between Cardiff Queen Street and Cathays / Caerphi
 lly from Saturday 24 to Friday 30 October
URL:https://www.nationalrail.co.uk/engineering-works/cardiff-queen-street
 -and-cathays-caerphilly-20261024/
DESCRIPTION:Date marker only\; not an all-day disruption claim.  Starts S
 aturday 24 October 2026 to Friday 30 October 2026 If you would like to f
 ollow this incident on X\, please use Train operators affected Transport
  for Wales Route(s) affected Transport for Wales between Penarth and Cae
 rphilly\, and between Merthyr Tydfil and Aberdare via Cardiff Queen Stre
 et Description Engineering work is taking place at Cardiff Queen Street\
 , closing one of the platforms and some of the lines in the area from Sa
 turday to Friday. Penarth - Caerphilly: A reduced service will run betwe
 en Cardiff Queen Street and Caerphilly. Cathays: On Saturday\, and from 
 Monday to Friday\, trains between Merthyr Tydfil and Aberdare via Cardif
 f Queen Street will not run via Cathays. On Saturday\, a reduced service
  will run between Cathays and Cardiff Central via Danescourt. From Monda
 y to Friday: f or travel to / from Llandaf / Cathays\, you can use your 
 ticket at no extra cost on Cardiff Bus services.  Last verified: 2026-10
 -28T01:30:38.466Z
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-national-rail-works-ipswich-and-halesworth-lowestoft-20261024@aero
 due.com
DTSTAMP:20261028T013038Z
DTSTART;VALUE=DATE:20261024
DTEND;VALUE=DATE:20261031
SUMMARY:Buses replace trains between Ipswich and Halesworth / Lowestoft f
 rom Saturday 24 to Friday 30 October
URL:https://www.nationalrail.co.uk/engineering-works/ipswich-and-haleswor
 th-lowestoft-20261024/
DESCRIPTION:Date marker only\; not an all-day disruption claim.  Starts S
 aturday 24 October 2026 to Friday 30 October 2026 If you would like to f
 ollow this incident on X\, please use Train operators affected Greater A
 nglia Route(s) affected Greater Anglia between Harwich International / I
 pswich and Lowestoft Description Engineering work is taking place betwee
 n Ipswich and Halesworth / Lowestoft\, closing all lines. Saturday and S
 unday: Buses replace trains between: Ipswich and Lowestoft (all stations
  except Beccles) Halesworth and Lowestoft via Beccles and Oulton Broad S
 outh Monday to Friday: Buses replace trains between Ipswich and Haleswor
 th.  Last verified: 2026-10-28T01:30:38.466Z
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-national-rail-works-tonbridge-wadhurst-20261024@aerodue.com
DTSTAMP:20261028T013038Z
DTSTART;VALUE=DATE:20261024
DTEND;VALUE=DATE:20261102
SUMMARY:Tonbridge to Wadhurst line closure: buses replace trains between 
 Tonbridge and Wadhurst from Saturday 24 October to Sunday 1 November
URL:https://www.nationalrail.co.uk/engineering-works/tonbridge-wadhurst-2
 0261024/
DESCRIPTION:Date marker only\; not an all-day disruption claim.  Starts S
 aturday 24 October 2026 to Sunday 01 November 2026 If you would like to 
 follow this incident on X\, please use Train operators affected Southeas
 tern Route(s) affected B etween London Charing Cross / London Cannon Str
 eet / Tonbridge and Tunbridge Wells / Hastings Description Engineering w
 ork is taking place between Tonbridge and Wadhurst\, closing all lines. 
 Background information on the work can be found below. Buses will replac
 e trains between Tonbridge and Wadhurst. On Sunday 1 November only \, th
 ese buses will be extended to run between Tonbridge and Battle. Ticket a
 cceptance: You can use the following alternative routes at no extra cost
 : Hastings / Ore : Southern services between Ashford International and O
 re / Hastings Southeastern Highspeed services between London St Pancras 
 International and Ashford International Southeastern (mainline) services
  between London and Ashford International via Tonbridge / Maidstone East
  Stonegate\, Wadhurst\, Frant and Tunbridge Wells: Southern services bet
 ween London Bridge and Uckfield Background information: Network Rail wil
 l be carrying out a major programme of railway improvements between Tonb
 ridge and Wadhurst. The main work will renew worn slab track in Grove Hi
 ll Tunnel\, just south of Tunbridge Wells. Slab track is fixed to a conc
 rete base and is used in some tunnels to strengthen and stabilise the ra
 ilway. Engineers will replace the old track slab and restore key railway
  systems in the tunnel. Full details of all the work taking place\, and 
 travel advice\, can be found on Southeastern's comprehensive project pag
 e . More technical details are available on the Network Rail website.  L
 ast verified: 2026-10-28T01:30:38.466Z
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-national-rail-works-cardiff-central-and-penarth-barry-barry-island
 -bridgend-20261025@aerodue.com
DTSTAMP:20261028T013038Z
DTSTART;VALUE=DATE:20261025
DTEND;VALUE=DATE:20261102
SUMMARY:Buses replace trains between Cardiff Central and Penarth / Barry 
 / Barry Island / Bridgend from 22:00 on Sunday 25 October and all day fr
 om Monday 26 October to Sunday 1 November
URL:https://www.nationalrail.co.uk/engineering-works/cardiff-central-and-
 penarth-barry-barry-island-bridgend-20261025/
DESCRIPTION:Date marker only\; not an all-day disruption claim.  Starts S
 unday 25 October 2026 to Sunday 01 November 2026 If you would like to fo
 llow this incident on X\, please use Train operators affected Transport 
 for Wales Route(s) affected Transport for Wales between Rhymney and Barr
 y Island / Bridgend\, between Bargoed / Caerphilly / Cardiff Central and
  Barry Island\, between Rhymney / Cardiff Central and Bridgend\, and als
 o between Rhymney / Caerphilly / Coryton / Cardiff Central and Penarth D
 escription Engineering work is taking place between Cardiff Central and 
 Bridgend\, closing all lines via Barry from 22:00 on Sunday evening unti
 l the end of service on Sunday 1 November. From 22:00 on Sunday and all 
 day Monday 26 October to Sunday 1 November: Buses will replace trains be
 tween Cardiff Central and Penarth / Barry / Barry Island / Bridgend.  La
 st verified: 2026-10-28T01:30:38.466Z
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-national-rail-works-mildmay-line-20261025@aerodue.com
DTSTAMP:20261028T013038Z
DTSTART;VALUE=DATE:20261025
DTEND;VALUE=DATE:20261030
SUMMARY:Amended late night / early morning London Overground Mildmay line
  services from Sunday 25 to Thursday 29 October
URL:https://www.nationalrail.co.uk/engineering-works/mildmay-line-2026102
 5/
DESCRIPTION:Date marker only\; not an all-day disruption claim.  Starts S
 unday 25 October 2026 to Thursday 29 October 2026 If you would like to f
 ollow this incident on X\, please use Train operators affected London Ov
 erground Route(s) affected London Overground between Stratford (London) 
 and Willesden Junction / Richmond / Clapham Junction Description Enginee
 ring work is taking place at various locations on the Mildmay line\, clo
 sing some lines overnight from Sunday evening until Friday morning. Sund
 ay: The 22:01 Stratford (London) to Richmond will not run. The 22:01 Str
 atford (London) to Willesden Junction will run. Monday to Thursday: Afte
 r approximately 21:45\, an amended and reduced service will run between 
 Stratford (London) and Willesden Junction / Clapham Junction / Richmond.
  Last Stratford (London) through trains: 22:18 Clapham Junction to Strat
 ford (London) 22:35 Stratford (London) to Clapham Junction 22:35 Richmon
 d to Stratford (London) 23:14 Stratford (London) to Richmond Ticket acce
 ptance: You can use earlier or later train services to complete your jou
 rney\, or: Local bus 220 and 337 for journeys between Willesden Junction
  and Clapham Junction via Shepherds Bush Local bus C1 and 28 for journey
 s from Shepherds Bush to Kensington Olympia London Underground District 
 line for West Brompton Local bus C3 for Clapham Junction to Imperial Wha
 rf. District line between Richmond and Gunnersbury London Underground Pi
 ccadilly / District line and local bus 70 between Acton Town and South A
 cton London Underground Central line and local bus 218 between West Acto
 n and Acton Central Local bus 220 and 337 for journeys between Willesden
  Junction and Shepherds Bush Local bus 220 and 187 for journeys between 
 Willesden Junction and Kensal Rise Local bus 302 or 52 for journeys betw
 een Kensal Rise and Brondesbury Park Local bus 206 for journeys between 
 Queens Park and Brondesbury Park London Underground Jubilee line for Wes
 t Hampstead and Finchley Road and Frognal Local bus 328 and 210 for jour
 neys between West Hampstead and Hampstead Heath Local bus C11 between Ha
 mpstead Heath and Gospel Oak Local bus 46 between Camden Road and Kentis
 h Town West London Underground Northern line to Kentish Town and bus 393
  for Kentish Town West London Underground Northern line to Camden Town a
 nd bus 29 or 253 to Camden Road Local bus 274 for journeys between Camde
 n Road and Caledonian Road & Barnsbury Local bus 43 and 153 between High
 bury & Islington an Last verified: 2026-10-28T01:30:38.466Z
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:national-rail-verified-nr-stansted-diversion-2026-11-22@aerodue.com
DTSTAMP:20261027T211257Z
DTSTART;VALUE=DATE:20261122
DTEND;VALUE=DATE:20261123
SUMMARY:Stansted Express: diverted trains and longer journeys before 09:0
 0 on 22 November
URL:https://www.nationalrail.co.uk/engineering-works/stansted-express-bef
 ore-09-00-20261122/
DESCRIPTION:Date marker only\; not an all-day disruption claim. National 
 Rail lists engineering work between London Liverpool Street and Tottenha
 m Hale on 22 November 2026 before 09:00. Stansted Express trains use Str
 atford\, with journeys extended by up to ten minutes and departures reti
 med by up to ten minutes. This is a rail-access change\, not an airport 
 or flight closure. Verified from National Rail's official page on 2026-1
 0-27 21:12 UTC\; the Radar could not obtain this notice through its auto
 matic collector in this run. Last verified: 2026-10-27T21:12:57.849Z
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-rail-strike-transpennine-express-2026-10-25@aerodue.com
DTSTAMP:20261023T003038Z
DTSTART;VALUE=DATE:20261025
DTEND;VALUE=DATE:20261026
SUMMARY:Schedule suspended: Industrial action to affect TransPennine Expr
 ess services on Sunday 11\, 18 and 25 October
DESCRIPTION:The original scheduled action was withdrawn or suspended by t
 he named source. This is not a cancellation of a passenger's flight. CLE
 ARED: Industrial action due to affect TransPennine Express services on 1
 1\, 18 and 25 October has been suspended
URL:https://www.nationalrail.co.uk/service-disruptions/tpe-ia-20260924/
STATUS:CANCELLED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-rail-strike-transpennine-express-2026-10-11@aerodue.com
DTSTAMP:20261009T062721Z
DTSTART;VALUE=DATE:20261011
DTEND;VALUE=DATE:20261012
SUMMARY:Schedule suspended: Industrial action to affect TransPennine Expr
 ess services on Sunday 11\, 18 and 25 October
DESCRIPTION:The original scheduled action was withdrawn or suspended by t
 he named source. This is not a cancellation of a passenger's flight. CLE
 ARED: Industrial action due to affect TransPennine Express services on 1
 1\, 18 and 25 October has been suspended SUSPENDED Industrial action (st
 rikes) planned for Sundays 11\, 18 and 25 October Find out more
URL:https://www.nationalrail.co.uk/service-disruptions/tpe-ia-20260924/
STATUS:CANCELLED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gb-rail-strike-transpennine-express-2026-10-18@aerodue.com
DTSTAMP:20261009T062721Z
DTSTART;VALUE=DATE:20261018
DTEND;VALUE=DATE:20261019
SUMMARY:Schedule suspended: Industrial action to affect TransPennine Expr
 ess services on Sunday 11\, 18 and 25 October
DESCRIPTION:The original scheduled action was withdrawn or suspended by t
 he named source. This is not a cancellation of a passenger's flight. CLE
 ARED: Industrial action due to affect TransPennine Express services on 1
 1\, 18 and 25 October has been suspended SUSPENDED Industrial action (st
 rikes) planned for Sundays 11\, 18 and 25 October Find out more
URL:https://www.nationalrail.co.uk/service-disruptions/tpe-ia-20260924/
STATUS:CANCELLED
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
