संपादकों और प्रकाशकों के लिए
Bordeaux Airport: taxiway works near runway 05/23, with possible runway use changes
आधिकारिक स्रोत और अपडेट
मूल घोषणा में कहा गया है: Bordeaux Airport: taxiway works near runway 05/23, with possible runway use changes
Bordeaux Airport schedules taxiway pavement works near runway 05/23 from 30 September to 1 November 2026. The work may require temporary closures of runway 05/23, with take-offs and landings potentially using runway 11/29 during those periods. Dates and hours are indicative and may change with work progress, technical constraints or weather. This notice does not establish a continuous runway or airport closure, or any particular flight cancellation. Verified from Bordeaux Airport's official page on 2026-10-28 21:28 UTC; the Radar could not obtain this notice through its automatic collector in this run.
आधिकारिक घोषणा क्या कहती है
इतिहास और समय-सारणी परिवर्तन
- 25 अक्टू॰ 2026, 12:30 am UTC · जारी
- 26 अक्टू॰ 2026, 1:30 am UTC · जारी
- 27 अक्टू॰ 2026, 1:30 am UTC · जारी
- 28 अक्टू॰ 2026, 1:30 am UTC · जारी
- 28 अक्टू॰ 2026, 9:28 pm UTC · जारी
संपादकों और प्रकाशकों के लिए
फ़्रांस · अन्य · 30 सितंबर 2026 · AeroDue · https://www.aerodue.com/hi/upcoming-disruptions/events/bordeaux-airport-taxiway-works-near-runway-05-23-with-possible-runway-use-change-162ae4286195/ · स्रोत की जाँच: 28 अक्टू॰ 2026, 9:28 pm UTC · https://www.bordeaux.aeroport.fr/laeroport/environnement/actualites-environnementales/travaux-aux-abords-la-piste-0523-du-30