Informasi gangguan AeroDue
Untuk editor dan penerbit
Rail engineering works Cambridge–Audley End: buses replace trains to Stansted Airport on 25 Oct
Sumber resmi dan pembaruan
Pengumuman asli menyebutkan: Rail engineering works Cambridge–Audley End: buses replace trains to Stansted Airport on 25 Oct
Sumber mencantumkan waktu berikut
On Sunday 25 October 2026 engineering work closes all lines between Cambridge and Audley End. CrossCountry: buses replace trains between Cambridge and Stansted Airport; Greater Anglia replacement buses run between Cambridge North and Audley End. Greater Anglia, Great Northern and Thameslink are also affected. Verified from National Rail's official page on 2026-10-24 20:18 UTC; the Radar could not obtain this notice through its automatic collector in this run.
Isi pengumuman resmi
StatusReferensi arsip
Tanggal25 Oktober 2026
NegaraInggris Raya
TransportasiKereta · Lainnya
BandaraSTN
MaskapaiTidak tercatat
Pemeriksaan sumber terakhir24 Okt 2026, 20.18 UTC
Pertama terdeteksi25 Okt 2026, 00.30 UTC
BuktiSumber resmi · national-rail
AeroDue IDnational-rail-verified-nr-stansted-cambridge-works-2026-10-25
Riwayat dan perubahan jadwal
- 25 Okt 2026, 00.30 UTC · Berlangsung
- 26 Okt 2026, 01.30 UTC · Referensi arsip
Untuk editor dan penerbit
Inggris Raya · Lainnya · 25 Oktober 2026 · AeroDue · https://www.aerodue.com/id/upcoming-disruptions/events/rail-engineering-works-cambridge-audley-end-buses-replace-trains-to-stansted-air-a1a8857cf915/ · Sumber terakhir diperiksa: 24 Okt 2026, 20.18 UTC · https://www.nationalrail.co.uk/engineering-works/stansted-airport-and-cambridge-20261025/