Dành cho biên tập viên và nhà xuất bản
Bordeaux Airport: taxiway works near runway 05/23, with possible runway use changes
Nguồn chính thức và cập nhật
Thông báo gốc nêu: Bordeaux Airport: taxiway works near runway 05/23, with possible runway use changes
Bordeaux Airport schedules taxiway pavement works near runway 05/23 from 30 September to 1 November 2026. The work may require temporary closures of runway 05/23, with take-offs and landings potentially using runway 11/29 during those periods. Dates and hours are indicative and may change with work progress, technical constraints or weather. This notice does not establish a continuous runway or airport closure, or any particular flight cancellation. Verified from Bordeaux Airport's official page on 2026-10-28 21:28 UTC; the Radar could not obtain this notice through its automatic collector in this run.
Nội dung thông báo chính thức
Lịch sử và thay đổi lịch trình
- 00:30 25 thg 10, 2026 UTC · Đang diễn ra
- 01:30 26 thg 10, 2026 UTC · Đang diễn ra
- 01:30 27 thg 10, 2026 UTC · Đang diễn ra
- 01:30 28 thg 10, 2026 UTC · Đang diễn ra
- 21:28 28 thg 10, 2026 UTC · Đang diễn ra
Dành cho biên tập viên và nhà xuất bản
Pháp · Khác · 30 tháng 9, 2026 · AeroDue · https://www.aerodue.com/vi/upcoming-disruptions/events/bordeaux-airport-taxiway-works-near-runway-05-23-with-possible-runway-use-change-162ae4286195/ · Nguồn được kiểm tra lúc: 21:28 28 thg 10, 2026 UTC · https://www.bordeaux.aeroport.fr/laeroport/environnement/actualites-environnementales/travaux-aux-abords-la-piste-0523-du-30