Skip to main content
AeroDue
☰ Explore
Check my journey
United Kingdom · Other · 24 October 2026

No service between Rutherglen and Exhibition Centre via Glasgow Central Low Level on Saturday 24 and Sunday 25 October

Starts Saturday 24 October 2026 to Sunday 25 October 2026 If you would like to follow this incident on X, please use Train operators affected ScotRail Route(s) affected B etween Larkhall / Motherwell / Whifflet / Cumbernauld / Rutherglen / Glasgow Central Low Level and Dalmuir, between Larkhall / Motherwell and Balloch, between Larkhall / Motherwe

What is happening

What the official announcement says

Archived reference

No service between Rutherglen and Exhibition Centre via Glasgow Central Low Level on Saturday 24 and Sunday 25 October

Date24 October 2026 – 25 October 2026
CountryUnited Kingdom
TransportRail
StatusArchived reference

What is confirmed

The published notice concerns this location and the dates shown above. This does not confirm that a particular flight or journey has been disrupted.

Possible effects on your journey

Service timetables, replacement transport or connections may change. The notice alone does not confirm what will happen to your specific service.

Before you travel

  1. Check your flight or service directly with its operator shortly before departure.
  2. Check onward connections and transfers, and leave appropriate contingency time.
  3. Keep operator notices and receipts if your journey changes.

No airport, airline or flight-specific effect has been confirmed in the collected details.

The scheduled period has passed; the page is retained as a historical record.

What you should do now

Official source and updates

The original announcement states: No service between Rutherglen and Exhibition Centre via Glasgow Central Low Level on Saturday 24 and Sunday 25 October

Original source text

Starts Saturday 24 October 2026 to Sunday 25 October 2026 If you would like to follow this incident on X, please use Train operators affected ScotRail Route(s) affected B etween Larkhall / Motherwell / Whifflet / Cumbernauld / Rutherglen / Glasgow Central Low Level and Dalmuir, between Larkhall / Motherwell and Balloch, between Larkhall / Motherwell / Cumbernauld and Milngavie, between Larkhall / Motherwell and Garscadden, between Motherwell and Hyndland, and also between Rutherglen and Exhibition Centre Description Engineering work is taking place between Rutherglen and Partick, closing all lines. No trains will run between Rutherglen and Exhibition Centre via Glasgow Central Low Level all weekend. For travel between Rutherglen, Dalmarnock, Bridgeton, Argyle Street, Anderston and Exhibition Centre, you should use alternative ScotRail trains where possible, and local buses at your own cost. Trains to / from Dunbartonshire will be diverted to run via Glasgow Queen Street Low Level. Trains to / from Lanarkshire will be diverted to run via Glasgow Central.

Source last checked: 25 Oct 2026, 00:30 UTC

Evidence

AeroDue ID: gb-national-rail-works-glasgow-central-low-level-20261024 · First detected: 25 Oct 2026, 00:30 UTC

Disruption alerts

Choose what matters to your trip and receive relevant changes by email, when the connected sources report them.

All disruptions · United Kingdom

Alerts depend on information we can verify and may arrive after the source publishes it. An alert does not guarantee that every service has returned to normal. Free. Cancel at any time from the link in every email.

About AeroDue

Collection runs four times a day, scheduled for 01:30, 07:30, 13:30 and 19:30 Europe/Lisbon. Timing may vary. Notices can change; always check the official source and your operator before travel.

Evidence and update method →

For editors and publishers

Read the editorial evidence and citation

No service between Rutherglen and Exhibition Centre via Glasgow Central Low Level on Saturday 24 and Sunday 25 October · AeroDue · https://www.aerodue.com/en-gb/upcoming-disruptions/events/no-service-between-rutherglen-and-exhibition-centre-via-glasgow-central-low-leve-04f067729dac/ · The source announcement was reviewed on: 25 Oct 2026, 00:30 UTC · https://www.nationalrail.co.uk/engineering-works/glasgow-central-low-level-20261024/