Disruptions · News

Istanbul Sabiha Gökçen: runway 06L/24R closed for maintenance through the winter until 27 March 2027

Runway 06L/24R at Istanbul Sabiha Gökçen Airport is temporarily closed to departing and arriving traffic for runway maintenance throughout the winter season, according to the airport events listing published by EUROCONTROL. The closure began at 23:00 UTC on 25 October 2026 and is scheduled to end at 02:00 UTC on 27 March 2027.

The winter closure is marked in the listing as having no impact on operations. Sabiha Gökçen is on the Asian side of Istanbul.

The same runway has further closures planned for 2027, and these are marked as having an impact: a first summer-season closure from 23:00 UTC on 28 March to 01:59 UTC on 10 May 2027, and a second from 23:00 UTC on 10 May to 01:59 UTC on 30 October 2027. The listing also shows taxiways R2 and A1 closed to traffic from 28 October 2026 until 25 January 2027, both marked as having an impact.

The listing does not explain how traffic is being handled during the closures, and it does not say whether any flights are being retimed, delayed or cancelled. Passengers flying to or from Sabiha Gökçen, especially next spring and summer, should check their flight details with their airline before travelling.

Check the operator's latest conditions before booking or travelling.

Source

Sources consulted on .

Google Search · AeroDue

Choose AeroDue as a preferred source

Help AeroDue's verified aviation reporting appear more prominently in your personalised Google Search experience.

Prefer AeroDue on Google