Langkau ke kandungan utama
AeroDue
☰ Teroka
Semak perjalanan saya
Maklumat gangguan AeroDue

Untuk editor dan penerbit

← Apa yang diumumkan

Paris-Orly runway 4 closed for renovation until 17 December 2026; traffic uses runways 2 and 3

Sumber rasmi dan kemas kini

Pengumuman asal menyatakan: Paris-Orly runway 4 closed for renovation until 17 December 2026; traffic uses runways 2 and 3

Sumber menyenaraikan waktu ini

The French transport ministry confirms Paris-Orly runway 4 is closed for renovation until 17 December 2026 and airport traffic is transferred to runways 2 and 3. The City of Orly dates the works from 10 August 2026. This is a runway restriction, not a closure of Paris-Orly Airport; no individual flight cancellation, delay, or safety incident is asserted. Verified from French Ministry of Ecological Transition and Transport's official page on 2026-11-07 16:39 UTC; the Radar could not obtain this notice through its automatic collector in this run.

Kandungan pengumuman rasmi

StatusSedang berlaku
Tarikh10 Ogos 2026 – 17 Disember 2026
NegaraPerancis
PengangkutanPenerbangan
Lapangan terbangParis-Orly Airport (ORY)
Syarikat penerbanganTidak direkodkan
Semakan sumber terakhir7 Nov 2026, 4:39 PTG UTC
Pengesanan pertama7 Nov 2026, 7:30 PTG UTC
BuktiSumber rasmi · fr-transport-ministry
AeroDue IDfr-transport-ministry-verified-fr-paris-orly-runway-4-works-2026-08-10

Sejarah dan perubahan jadual

JSON · Data dan langganan ↗

Bukti dan kaedah kemas kini (EN) →

Untuk editor dan penerbit

Paris-Orly runway 4 closed for renovation until 17 December 2026; traffic uses runways 2 and 3 · AeroDue · https://www.aerodue.com/ms/upcoming-disruptions/events/paris-orly-runway-4-closed-for-renovation-until-17-december-2026-traffic-uses-ru-06c781d15dc4/ · Sumber disemak pada: 7 Nov 2026, 4:39 PTG UTC · https://www.ecologie.gouv.fr/politiques-publiques/aeroport-paris-orly-fermeture-piste-4-jusquau-17-decembre-2026-inclus

Lihat bukti dan petikan →