跳到主要內容
AeroDue
☰ 探索
檢查我的行程
AeroDue 旅運中斷資訊

供编辑及出版机构

← 已公布什么

Paris-Orly runway 4 closed for renovation until 17 December 2026; traffic uses runways 2 and 3

官方来源和更新

原始公告指出: Paris-Orly runway 4 closed for renovation until 17 December 2026; traffic uses runways 2 and 3

来源列出以下时段

The French transport ministry confirms Paris-Orly runway 4 is closed for renovation until 17 December 2026 and airport traffic is transferred to runways 2 and 3. The City of Orly dates the works from 10 August 2026. This is a runway restriction, not a closure of Paris-Orly Airport; no individual flight cancellation, delay, or safety incident is asserted. Verified from French Ministry of Ecological Transition and Transport's official page on 2026-11-07 16:39 UTC; the Radar could not obtain this notice through its automatic collector in this run.

官方公告内容

狀態進行中
日期2026年8月10日 – 2026年12月17日
國家法國
交通方式航空
機場Paris-Orly Airport (ORY)
航空公司未記錄
最近來源檢查時間2026年11月7日 下午4:39 UTC
首次發現2026年11月7日 晚上7:30 UTC
證據官方來源 · fr-transport-ministry
AeroDue IDfr-transport-ministry-verified-fr-paris-orly-runway-4-works-2026-08-10

歷史及日程變更

JSON · 資料與訂閱 ↗

證據與更新方法 (EN) →

供编辑及出版机构

Paris-Orly runway 4 closed for renovation until 17 December 2026; traffic uses runways 2 and 3 · AeroDue · https://www.aerodue.com/zh-tw/upcoming-disruptions/events/paris-orly-runway-4-closed-for-renovation-until-17-december-2026-traffic-uses-ru-06c781d15dc4/ · 来源核查时间: 2026年11月7日 下午4:39 UTC · https://www.ecologie.gouv.fr/politiques-publiques/aeroport-paris-orly-fermeture-piste-4-jusquau-17-decembre-2026-inclus

查看证据和引用信息 →