Disruptions · News

Manchester Airport: runway 05L/23R to close for five nights from 6 December for maintenance

Runway 05L/23R at Manchester Airport will be closed for five consecutive nights in early December 2026 for scheduled maintenance and repairs to northside taxiways, according to the airport events listing published by EUROCONTROL. The closure runs from 22:30 UTC on 6 December to 06:00 UTC on 11 December, and all flights will use runway 05R/23L while the work is in progress.

The entry is marked as having an impact on operations. With runway 05L/23R out of use, night-time traffic during this period will be concentrated on the airport's other runway.

The same listing shows a separate, overlapping job: upgrades to the pumps of the aircraft fuel hydrant system, with shutdowns on the nights from 7 to 10 December between 7 December and the early hours of 11 December. That entry is marked as having no impact. A reconstruction of Taxiway Delta between D7 and D8, which began on 23 November and is scheduled to run until 28 May 2027, is marked as having an impact.

The listing does not say whether any flights will be retimed, delayed or diverted during the runway closure, and it gives no figures for the number of movements affected. Passengers with late-evening or early-morning flights to or from Manchester between 6 and 11 December should check their flight status with their airline before travelling.

Check the operator's latest conditions before booking or travelling.

Source

Sources consulted on .

Google Search · AeroDue

Choose AeroDue as a preferred source

Help AeroDue's verified aviation reporting appear more prominently in your personalised Google Search experience.

Prefer AeroDue on Google